Showing posts with label Grid Control series. Show all posts
Showing posts with label Grid Control series. Show all posts

Tuesday, November 28, 2017

Grid Control, Vol. 30: These weird, useless "enhanced" crosswalk gizmos remind us that HWC's and Deaf Gahan's "complete roads" downtown are not "complete streets."


They've been called "enhanced" crosswalks and "high visibility" crosswalks. They're a prominent feature of downtown New Albany's new two-way street (or is it "road"?) grid.

In the following announcement from the University of Virginia, crosswalk safety remains entirely about the pedestrian, who must "use" these mechanisms correctly in the faith-driven hope that drivers might understand their own responsibilities to share the patch.

Not everyone pushes the button.

But how many drivers are paying attention?

How many know what this means?

Rapid Flashing Beacons Enhance Crosswalk Safety at the Push of a Button

... “Rapid Flashing Beacons allow the University to put more lights in more locations across Grounds in ways that are less invasive, easier to maintain, and less disruptive to traffic. Most importantly, RFBs are very reliable. All of this points to increased pedestrian safety if used correctly,” said Director of Safety and Emergency Preparedness Marge Sidebottom.

Because these lights are above ground at approximately eye level, it’s easy for pedestrians to check that lights are flashing before entering the crosswalk. Drivers should be aware that flashing lights means that a pedestrian is near. Unfortunately, though, not everyone pushes the button.

“The key to safety is that pedestrians must activate the lights,” Sidebottom said. “Studies have shown that the rapid flashing lights are effective in getting drivers' attention, but pedestrians need to push the button. Then, they need make sure that cars have stopped before entering the road. Pedestrians always face the greatest danger in a run-in with a car, regardless of who has the legal right-of-way.”

This passage might have been written by HWC Engineering, hence the sad reality of the imperfect implementation of two-way roads (are they streets?) in New Albany.

That's because as a non-automotive user of the city streets, I've found these credit-card-sized flashing beacons to be complete and utter jokes.

People walking still will find it far safer to look both ways and cross in the middle of a block; in spite of claims that traffic is moving more slowly since the reversion, the fact is that far too few calming measures were built into the rebooted grid. Team Gahan bet the farm that "friction" alone would calm traffic sufficiently for the myriad other two-way benefits to emerge.

Maybe, though these streets are still straightaways, just like before. They're still built to promote speed and indifference, just like before, though now with "enhanced" crosswalk beacons intended not as a legitimate means of rectifying a root problem, but as a "hey, we did something" gesture, another bright, shiny paste-over symbol, this one pointing to how the fundamental mobility issues downtown have not been addressed at all by a "modernization" program that preserved (certainly on purpose) the downtown grid as composed of "complete roads" rather than altered into "complete streets."

Charles Marohn nails the explanation of this difference in a six-year-old post from Strong Towns. It is published here in its entirety. Jeff Gahan made sausage out of Jeff Speck's prime proposals by handing them to HWC Engineering, and HWC Engineering co-opted it in precisely the fashion described by Marohn.

Speck understood the transformative nature of a genuine complete street. Gahan feared it.

Cowardice won.

---

CO-OPTING COMPLETE STREETS

The idea of a Complete Street is compelling in almost every way, but when the engineering profession begins to adopt it wholesale, we need to pause and look at the outcomes. Are we getting Complete Streets, or are we getting Complete Roads. The difference is tremendous and will impact the financial viability of an approach to building places that is long overdue.

The Complete Streets concept is one that is long overdue. We've spent two generations transforming a public realm once comprised of walkable, mixed-use neighborhoods into auto-only zones. These are places where the kids used to play ball in the street. Today a kid can't even play safely in their own front yard.

At Strong Towns, we've worked to illuminate the fact that this transformation has been done at tremendous financial cost. This is not only because the construction of wider, flatter and straighter streets has been expensive, but because the auto-centric nature of the transformed public realm drives private-sector investment out of traditional neighborhoods, dislocating it to places that provide more buffering to the car.

Not only that, but the redevelopment that has happened in these neighborhoods has largely been on a suburban framework, using the parking ratios, setbacks and coverage restrictions of modern zoning to reduce density (and the rate of return). Financially, these places are largely insolvent, lacking the tax base to maintain their basic infrastructure.

Enter the concept of a Complete Street. To me, the fundamental contribution of Complete Streets to the discourse surrounding the future of our towns and neighborhoods is the recognition that our streets must serve more than just cars and that the public realm can no longer be an auto-only zone. The fact that the Complete Streets model has broken the stranglehold that the auto-only design mentality has had on our streets should be the cause of unending rejoice.

In March I was able to have dinner with Kaid Benfield. During the course of our conversation, he enlightened me on how the Leadership in Energy and Environmental Design (LEED) standards were tweaked with Neighborhood Design principles. The result, LEED-ND, takes a great concept -- buildings that are energy efficient and environmentally friendly -- and overlays it on a development framework that reinforces these principles. In other words, no more "green" buildings in the middle of a greenfield, with 30 mile commutes each way.

In a similar vein, we're going to now, humbly, suggest a way in which the Complete Streets concept can evolve to achieve what I believe is its principle intent, that being Complete Neighborhoods.

I've now seen two projects where engineers promoted the use of "complete streets". In each I see the engineering profession co-opting the Complete Streets moniker without any thought to a Complete Neighborhood. For the engineers on these projects, the approach remains the same. I'll quote from our piece, Confessions of a Recovering Engineer:

An engineer designing a street or road prioritizes the world in this way, no matter how they are instructed:

Traffic speed
Traffic volume
Safety
Cost

The rest of the world generally would prioritize things differently, as follows:

Safety
Cost
Traffic volume
Traffic speed

In other words, the engineer first assumes that all traffic must travel at speed. Given that speed, all roads and streets are then designed to handle a projected volume. Once those parameters are set, only then does an engineer look at mitigating for safety and, finally, how to reduce the overall cost (which at that point is nearly always ridiculously expensive).

One of the places I've seen Complete Streets applied is My Hometown's Last Great Old Economy Project (also known as the College Drive project). In this instance, the design starts with a minimum design speed and a projected traffic volume, the latter being the stated impetus for the project. This analysis provides us with four lanes of fast-moving traffic. The engineers then move on to the "safety" criteria and the mandate that -- if we can afford it -- we accommodate bikes and pedestrians. This is done, of course, at tremendous cost - estimated at over $7 million for a mile of road.

Now notice that I called this route a "road" and not a "street". Understanding the difference between a road and a street is critical to understanding the problem we have with engineers misusing the Complete Streets approach. From our Placemaking Principles for a Strong Town:

To build an affordable transportation system, a Strong Town utilizes roads to move traffic safely at high speeds outside of neighborhoods and urban areas. Within neighborhoods and urban areas, a Strong Town uses complex streets to equally accommodate the full range of transportation options available to residents.

Roads move cars at high speeds. Streets move cars at very slow speeds. We should build roads outside of neighborhoods, connecting communities across distances. We should build streets within neighborhoods where there are homes, businesses and other destinations. The auto-road is a post-WW II replacement of the rail-road. The street should be what it has always been; the street.

The fundamental design flaw of the post WW II development pattern -- the false premise upon which every other design tragedy has been committed -- is the transformation of our streets into roads.

High speed auto travel has no place in urban areas where the cost of development demands a complex neighborhood pattern with a mixing of uses, multiple modes of travel and a public realm that enhances the value of the adjacent properties. High speed traffic destroys value in our neighborhoods. It drives out investment. There is no amount of pedestrian enhancement that we can build to offset the negative response people have to being in the close proximity of speeding traffic.

Without aggressive traffic calming -- which is part of the Complete Streets playbook -- we will simply be building Complete Roads. A Complete Road will not transform the public realm, no matter how much money we put into accommodating pedestrians and bikers with bridges and tunnels. A Complete Road will not attract significant private-sector investment in the key neighborhoods where we have so much existing infrastructure liability. And a Complete Road will cost a fortune, without changing the insolvency problem facing our cities.

If there is one thing our current financial situation should teach us about the engineering profession it is this: engineers will bankrupt us if given the chance to build our cities and towns the way they envision them. It is predictable that the engineering profession will embrace the concept of a Complete Road -- which is nothing more than a bad design made PC by throwing an expensive bone to bikers and pedestrians -- because it fits with their hierarchy of values (speed, volume, safety and then cost). Insidiously, promoting Complete Roads will ensure them more funding than they would otherwise receive. You can call them "streets" all you want - unchecked, they are going to build "roads". (For example, check out the 14-foot highway lane widths on the Complete "Street" cross section on My Hometown's Last Great Old Economy Project).

We love Complete Streets. They are essential to a Strong Town. Let's get out there and build them, but make sure the engineers don't con you into a Complete Road. Demand slow cars and a Complete Neighborhood to go along with your Complete Street.

---

For previous Grid Control series links, go here.

Thursday, November 02, 2017

Grid Control, Vol. 29: Market Street now is two-way the entire way, though it complicates parking garage access.



For reasons unknown, the reversion of Market Street to two-way traffic (specifically, between State Street and W. 5th) was not part of the federal 80-20 funding mechanism of the grid modernization and (and campaign monetization) project.
Downtown 2-way Conversion Update - Market Fully 2-way on Oct 31

The final stretch of Market Street set to be converted to 2-way traffic (from State Street to West 5th Street) will convert on October 31st. The intersection at Scribner and Market Street will temporarily be a 4-way stop while crews work to convert the signal. After this conversion is complete, all of Market Street will hold 2-way traffic.

It has happened. Interestingly, the reversion has a side effect in the sense of restricting access to the parking garage for traffic traveling eastbound on Market -- including those drivers eastbound on I-64 who exit into New Albany and approach downtown from the west.


The median precludes a left turn into the Market Street garage entrance; while a left turn into the parking garage from State (northbound) remains theoretically possible, it involves crossing two lanes of traffic where southbound cars are stacked headed south at the light.

Of course, drivers eastbound on Market can circle the block via Pearl and Spring to get back to State southbound, and easy garage access; ironically, ending the necessity of making such loops was a prime reason for the reversion to two-way traffic.

In my opinion, both medians between W. 1st and Pearl would have been better removed, traffic lanes narrowed and moved to one side of the street or the other, and room for human use added. For Jeff Speck's innovative (and predictably discarded) thoughts on this stretch of street, go here and scroll to page 68.

For previous "Grid Control" series links, go here: Grid Control, Vol. 28: Elm Street capitulates to two-way modernity with a whimper, not a bang. Now, to the next stage.

Tuesday, October 03, 2017

Grid Control, Vol. 28: Elm Street capitulates to two-way modernity with a whimper, not a bang. Now, to the next stage.



This morning, a few days belated, Elm Street was reverted to two-way traffic. Probably no one even noticed, and therein lies an observation.

I'll always be fascinated by a decade or more of sheer sloth and acrimony, followed by 3-4 years of municipal bureaucratization, then the doomsday predictions of dozens of experts on social media -- and two days after Spring Street became two-way, there was complete and utter silence, with nary a peep since.

As I fee compelled to say over and over: This isn't the end of the push for a modern street grid to benefit all users, not only drivers. Rather, it's the end of the beginning.

Meanwhile, in our last Grid Control installment, Brad on Market Street reported issues with parking stripe placement relative to signage, and also this instance of a potentially blocked driveway.

My neighbor's driveway. Not that they use it much, but I feel like they should have the option without the chance of getting blocked in ...


Brad reports the latter issue to have been fixed and provides this proof.


---

Previously:


Grid Control, Vol. 27: A case of parking space inconvenience on Market Street.


Grid Control, Vol. 26: The 2-Pocalyptic contagion claims another victim as Market Street capitulates to modernity.


Grid Control, Vol. 25: If Breakwater's overflow parking has been "donated" by AT&T, why weren't crosswalks installed for residents to access it?


Grid Control, Vol. 24: Deliver me this.



Grid Control, Vol. 23: City's fuddy-duddies losing their minds as the debut for a two-way Spring Street is pegged at August 29.

Grid Control, Vol. 22: City engineer Larry Summers answers our questions about intersection striping errors and the "No Trucks" sign removal.




Grid Control, Vol. 21: Murderous intersection at Spring & 10th to be repaved and restriped -- and, the hocus-pocus with a disappearing "No Trucks" sign at Spring & Vincennes.



Grid Control, Vol. 20: As Team Gahan dawdles, another bicyclist is crushed into mincemeat at 10th & Spring's dangerous dogleg.




Grid Control, Vol. 19: In a positive move, HWC begins righting the wrong cross hatching on Spring Street.



Grid Control, Vol. 18: Finally a few BoW street grid project answers, almost all of them citing "contractor error."

Grid Control, Vol. 17: Judging by the misdirection of this "CROSS TRAFFIC DOES NOT STOP" sign, we now reside in the British Empire.



Grid Control, Vol. 16: What about HWC's cross hatching correction? Will this be finished before or after Team Gahan declares victory?


Grid Control, Vol. 15: Dooring enhancement perfectly epitomizes Deaf Gahan's "biking last" approach to grid modernization.

Grid Control, Vol. 14: Yes, you can still park on the south side of Spring Street during the stalled two-way grid project.

Grid Control, Vol. 13: "Dear Deaf Gahan and minions: FOR THE LOVE OF PETE, STOP TRYING TO BE COOL AND DESIGNER-ISH. YOU'RE NOT, AND IT'S EMBARRASSING ALL OF US."




Grid Control, Vol. 12: Meet the artistic crosswalk design equivalent of dogs playing poker.

Grid Control, Vol. 11: HWC Engineering meets with St. Marks, city officials nowhere to be found.

Grid Control, Vol. 10: City officials predictably AWOL as HWC Engineering falls on its sword over striping errors.

Grid Control, Vol. 9: "This was supposed to be discussed with us," but Dear Leader doesn't ever discuss, does he?


Grid Control, Vol. 8: City Hall characteristically mum as HWC Engineering at least tries to answer the cross-hatching question.


Grid Control, Vol. 7: What will the Board of Works do to rectify HWC's striping errors on the north side of Spring Street, apart from microwaving another round of sausage biscuits?


Grid Control, Vol. 6: Jeff Speck tweets about NA's grid changes, and those missed bicycling opportunities.


Grid Control, Vol. 5: Egg on HWC Engineering's well-compensated face as it botches Spring Street's westbound bike buffer cross hatching.


Grid Control, Vol. 4: But this actually isn't a bus lane, is it?


Grid Control, Vol. 3: TARC's taking your curbside church parking, says City Hall.


Grid Control, Vol. 2: Southsiders get six more parking inches, but you gotta love those 10-foot traffic lanes on Spring.




Grid Control, Vol. 1: You people drive so freaking horribly that someone's going to die at Spring and 10th.


Wednesday, September 27, 2017

Grid Control, Vol. 27: A case of parking space inconvenience on Market Street.

Brad, a regular blog reader and Market Street resident, sent me a few photos.

Where the street sign has been placed causes me to have to park so far forward that I cross the parking line. If I don't when the kids get out of the car the door hits the sign post. Did anybody (with the street grid engineers) have a ruler when they designed the project?




My neighbor's driveway. Not that they use it much, but I feel like they should have the option without the chance of getting blocked in ...


Brad also informed the city. Two weeks later, he hasn't heard back from anyone.



It's worth noting that our street department had nothing to do with the grid modernization design (HWC Engineering) and implementation (Ragle). Still, street department employees probably will be dealing with seemingly minor matters like this for some time to come ... except they aren't minor at all for daily users.

Let's hope someone in the bunker is reading, and gives Brad the courtesy of a reply.

After all, if dentists on Spring Street regularly receive valet city attorney service for parking complaints, shouldn't we all?

---

Previously:

Grid Control, Vol. 26: The 2-Pocalyptic contagion claims another victim as Market Street capitulates to modernity.


Grid Control, Vol. 25: If Breakwater's overflow parking has been "donated" by AT&T, why weren't crosswalks installed for residents to access it?


Grid Control, Vol. 24: Deliver me this.



Grid Control, Vol. 23: City's fuddy-duddies losing their minds as the debut for a two-way Spring Street is pegged at August 29.

Grid Control, Vol. 22: City engineer Larry Summers answers our questions about intersection striping errors and the "No Trucks" sign removal.



Grid Control, Vol. 21: Murderous intersection at Spring & 10th to be repaved and restriped -- and, the hocus-pocus with a disappearing "No Trucks" sign at Spring & Vincennes.



Grid Control, Vol. 20: As Team Gahan dawdles, another bicyclist is crushed into mincemeat at 10th & Spring's dangerous dogleg.




Grid Control, Vol. 19: In a positive move, HWC begins righting the wrong cross hatching on Spring Street.



Grid Control, Vol. 18: Finally a few BoW street grid project answers, almost all of them citing "contractor error."

Grid Control, Vol. 17: Judging by the misdirection of this "CROSS TRAFFIC DOES NOT STOP" sign, we now reside in the British Empire.



Grid Control, Vol. 16: What about HWC's cross hatching correction? Will this be finished before or after Team Gahan declares victory?


Grid Control, Vol. 15: Dooring enhancement perfectly epitomizes Deaf Gahan's "biking last" approach to grid modernization.

Grid Control, Vol. 14: Yes, you can still park on the south side of Spring Street during the stalled two-way grid project.

Grid Control, Vol. 13: "Dear Deaf Gahan and minions: FOR THE LOVE OF PETE, STOP TRYING TO BE COOL AND DESIGNER-ISH. YOU'RE NOT, AND IT'S EMBARRASSING ALL OF US."




Grid Control, Vol. 12: Meet the artistic crosswalk design equivalent of dogs playing poker.

Grid Control, Vol. 11: HWC Engineering meets with St. Marks, city officials nowhere to be found.

Grid Control, Vol. 10: City officials predictably AWOL as HWC Engineering falls on its sword over striping errors.

Grid Control, Vol. 9: "This was supposed to be discussed with us," but Dear Leader doesn't ever discuss, does he?


Grid Control, Vol. 8: City Hall characteristically mum as HWC Engineering at least tries to answer the cross-hatching question.


Grid Control, Vol. 7: What will the Board of Works do to rectify HWC's striping errors on the north side of Spring Street, apart from microwaving another round of sausage biscuits?


Grid Control, Vol. 6: Jeff Speck tweets about NA's grid changes, and those missed bicycling opportunities.


Grid Control, Vol. 5: Egg on HWC Engineering's well-compensated face as it botches Spring Street's westbound bike buffer cross hatching.


Grid Control, Vol. 4: But this actually isn't a bus lane, is it?


Grid Control, Vol. 3: TARC's taking your curbside church parking, says City Hall.


Grid Control, Vol. 2: Southsiders get six more parking inches, but you gotta love those 10-foot traffic lanes on Spring.




Grid Control, Vol. 1: You people drive so freaking horribly that someone's going to die at Spring and 10th.


Tuesday, September 12, 2017

Grid Control, Vol. 26: The 2-Pocalyptic contagion claims another victim as Market Street capitulates to modernity.


I walked the length of the Market Street reversion, and the first day of two-way traffic appears to have been smooth, with nothing near the agitated (and unwarranted) hair-pulling that accompanied Spring Street's changeover two weeks ago.

We begin at the intersection of Vincennes and East Market with the familiar symbol of municipal surrender to auto-centrism, the sharrow (above). I predict you'l be seeing lots of these on Market, which as yet has not been completely striped from about 10th to Vincennes. Below, very deep angled parking spaces await striping near the unsightly mess borne of the Lancaster/Market Boy duggins-lition.


Will these be bikes lanes without buffers?


This would be a candidate for the caption contest. The vehicle in the middle might have been there a while, anyway.



The nest view is the closest I saw to an accident, from long-distance. I'll diagram it.



The driver northbound on 11th wanted to turn left (westbound) on Market, but had to wait until the driver traveling eastbound in what is now the wrong lane (on Market) got out of the way. Fortunately the northbound driver saw what was happening and paused. The eastbound driver finally took stock of the situation in front of the funeral home and observed the proper lane.

On both sides of the memorial island are strips of, well, what?


The 7th Street intersection was fine.


In was a rainy afternoon with little traffic. Of course, Market always has been lightly traveled. The intersection with Bank Street was deserted. In spite of the angled spaces as yet unstriped, drivers looked to be making the right choices.


Market and Pearl.


The two-way stretch of Market Street begins/ends at State Street. Officer Haub waited by the fork to correct the errant.


There's not enough time at present, but a thought was prompted for a future installment of Grid Control: why wasn't the two-way reversion extended all the way into the West End?


My immediate guesses would be (a) the state of Indiana's control of the grid adjacent to the interstate ramps, and/or (b) access to the parking garage and the obstruction of the needless median between State and W. 1st.

Jeff Speck addressed this; when there's time, I'll dig out his (ignored) recommendation. Until then, let me know what you're thinking about a future two-way Market Street between State and W. 5th.

---

Previously:

Grid Control, Volume 25: If Breakwater's overflow parking has been "donated" by AT&T, why weren't crosswalks installed for residents to access it?


Grid Control, Vol. 24: Deliver me this.



Grid Control, Vol. 23: City's fuddy-duddies losing their minds as the debut for a two-way Spring Street is pegged at August 29.

Grid Control, Vol. 22: City engineer Larry Summers answers our questions about intersection striping errors and the "No Trucks" sign removal.



Grid Control, Vol. 21: Murderous intersection at Spring & 10th to be repaved and restriped -- and, the hocus-pocus with a disappearing "No Trucks" sign at Spring & Vincennes.



Grid Control, Vol. 20: As Team Gahan dawdles, another bicyclist is crushed into mincemeat at 10th & Spring's dangerous dogleg.




Grid Control, Vol. 19: In a positive move, HWC begins righting the wrong cross hatching on Spring Street.



Grid Control, Vol. 18: Finally a few BoW street grid project answers, almost all of them citing "contractor error."

Grid Control, Vol. 17: Judging by the misdirection of this "CROSS TRAFFIC DOES NOT STOP" sign, we now reside in the British Empire.



Grid Control, Vol. 16: What about HWC's cross hatching correction? Will this be finished before or after Team Gahan declares victory?


Grid Control, Vol. 15: Dooring enhancement perfectly epitomizes Deaf Gahan's "biking last" approach to grid modernization.

Grid Control, Vol. 14: Yes, you can still park on the south side of Spring Street during the stalled two-way grid project.

Grid Control, Vol. 13: "Dear Deaf Gahan and minions: FOR THE LOVE OF PETE, STOP TRYING TO BE COOL AND DESIGNER-ISH. YOU'RE NOT, AND IT'S EMBARRASSING ALL OF US."




Grid Control, Vol. 12: Meet the artistic crosswalk design equivalent of dogs playing poker.

Grid Control, Vol. 11: HWC Engineering meets with St. Marks, city officials nowhere to be found.

Grid Control, Vol. 10: City officials predictably AWOL as HWC Engineering falls on its sword over striping errors.

Grid Control, Vol. 9: "This was supposed to be discussed with us," but Dear Leader doesn't ever discuss, does he?


Grid Control, Vol. 8: City Hall characteristically mum as HWC Engineering at least tries to answer the cross-hatching question.


Grid Control, Vol. 7: What will the Board of Works do to rectify HWC's striping errors on the north side of Spring Street, apart from microwaving another round of sausage biscuits?


Grid Control, Vol. 6: Jeff Speck tweets about NA's grid changes, and those missed bicycling opportunities.


Grid Control, Vol. 5: Egg on HWC Engineering's well-compensated face as it botches Spring Street's westbound bike buffer cross hatching.


Grid Control, Vol. 4: But this actually isn't a bus lane, is it?


Grid Control, Vol. 3: TARC's taking your curbside church parking, says City Hall.


Grid Control, Vol. 2: Southsiders get six more parking inches, but you gotta love those 10-foot traffic lanes on Spring.




Grid Control, Vol. 1: You people drive so freaking horribly that someone's going to die at Spring and 10th.