Showing posts with label bids. Show all posts
Showing posts with label bids. Show all posts

Sunday, February 17, 2019

Bid rigging, corruption, procurement fraud and red flags -- apropos of nothing, or something; whatever.


Corruption happens because there is impunity. That's the reason why corruption is widespread at all levels - from the person who asks for a bribe on the street to those who hold prominent positions.
-- João Manuel Gonçalves Lourenço

Most of us assume that a system of competitive bidding for government contracts precludes chicanery. Here's an excerpt about bid rigging from Wikipedia.

Bid Rigging as acts of corruption[edit]

  • Change order abuse occurs when a contractor colludes with project officials, wins a low bid, then asks to change the contract afterwards. This is approved by officials, resulting in a much higher bid being retroactively approved.[1]
  • Bidder Exclusion allows project officials to essentially choose their bid. There are multiple methods to achieve this end including:
    • Instituting unreasonable qualification parameters, excluding non-preferred firms, or effectuating the same by shortening the time of acceptance periods for new bids following a request.
    • Advertising projects to select bidders or bidding markets, thereby reducing publicity of bid procurement.
    • Bundling of contracts to exclude bidders.
    • Coercion and intimidation can also be used or simply rejection of individual bids over trivial matters.[2]
  • Purchase splitting to reduce the minimum bid amount. This functions as contracts are split up to reduce the actual procurement amount and keep it under a threshold value. This reduces competitive bidding and enables less oversight at the project level as bid prices drop and kickbacks can be allotted.[3]
  • Leaking of bid information, which requires a relationship of some degree between the project and a bidder as the bidder is handed information to gain an unfair advantage.[4]
  • Bid Manipulation is another method for officials to choose the bidder of their choice but occurs after receipt of bids. The methods for this would include either changing bid parameters, evaluation processes, or other activity to effectively select the bidder of choice.[5]
  • Rigged Specifications allow more bidder exclusion by officials by either tailoring requests to individual bidders or creating a vague criterion to reasonably choose a preferred bidder.[6]
  • Unbalanced bidding involves high bid prices for commencing phases of development and low prices for later stages. This effectively increases the flow of funds for the bidding firm. This occurs when bidders cite high prices for items, intending to raise the number of units and purchase them at a competitive rate while simultaneously skimming profits from the artificially high bid price. Additionally, bidders may give low quotes for non-necessary items (knowledge gained through collusion or experience) to disadvantage other firms as their bid amount is more competitive. This also serves to increase the cost of entry for new firms.[7]
  • Unjustified Sole Source Awards are bids chosen on criterion unrelated to their competitiveness. This can be performed either blatantly, by falsifying bids, or by price splitting.[8]

And another: THE MOST COMMON PROCUREMENT FRAUD SCHEMES AND THEIR PRIMARY RED FLAGS, by W. Michael Kramer (International Anti-Corruption Resource Center)

BRIBES AND KICKBACKS

A bribe is usually defined as the giving or receiving of a “thing of value” to corruptly influence the actions of another, most commonly to influence a contract award or the execution of a contract.   A “kickback” is a bribe paid by the contractor after it is paid.  Most bribes in exchange for large contract awards in international development projects are paid as kickbacks, usually 5%-20% of the contract value.
Corrupt payments
The bribe need not be in money or cash, and often is not.  Any benefit given or received with the intent to corruptly influence the recipient can be a bribe.
“Things of value” that have been given and received as bribes include:
  • Expensive gifts, free travel and lavish entertainment
  • “Loans,” whether or not repaid
  • Use of credit cards
  • Sexual favors (hiring of prostitutes, etc.)
  • Overpaying for purchases, e.g., paying $20,000 for a car worth $5,000
  • Cash
  • Fees and commissions, even if recipient allegedly provided services to the payer
  • Hidden interests in business transactions
Often the payments follow the general sequence outlined above, with the amount and form of payments becoming more significant and incriminating as the scheme progresses.
Corrupt influence
  • Corrupt influence often is reflected as, among other things:
  • Qualifying an unqualified or untested company to bid or be a vendor
  • Improper or non-competitive contract awards
  • Paying too much for goods or services
  • Buying too much of an item, or buying inappropriate items
  • Continued acceptance of low quality or non-compliant goods or services
As the corruption continues, the abuses often turn into fraud, such as fictitious invoices, with the parties conspiring to split the profits.   Eventually the excesses of the scheme lead to its detection, as the mounting evidence of favorable treatment and fraud, and the conspicuous expenditures of the conspirators, call attention to their behavior.
The major red flags of bribes and kickbacks
  • Improper (e.g., non-competitive) selection of a contractor Unjustified favoritism of a certain contractor, e.g. approval of high prices, excessive purchases, continued acceptance of low quality goods, etc.
  • Unnecessary broker or middleman involved in transactions
  • Procurement official accepts inappropriate gifts and entertainment
  • Unexplained increase in wealth by procurement official

Tuesday, January 16, 2018

Hemorrhaging votes, an increasingly disoriented Deaf Gahan sidesteps Mt. Tabor-Klerner intersection ... for now.


In a stunning roundabout turnabout, Deaf Gahan dispatched his Minister of Engineering to this morning's meeting of the Board of Public Works and Safety, and with little fanfare, erased his previous line in the sand -- and drew a new one to the west of the intersection of Mt. Tabor Road and Klerner Lane.


In the aftermath, City Hall's patented Tilt-A-Whirl propaganda wheel was utterly predictable: Don't you see, peasants? Dear Leader listened to your comments at the most recent public meeting.

Are your hip boots on?

On January 2nd, the City of New Albany held the third public information meeting for the Mt. Tabor Road Project. After receiving feedback and comments from residents and engineers, the City of New Albany has removed plans to modify the intersection at Mt. Tabor Road and Klerner Lane. As part of this federally-funded project, the four-way stop will remain ...

... “We will keep working to improve the roadway and infrastructure at Mt. Tabor Road,” stated Mayor Jeff Gahan. “We welcome and appreciate the input and feedback from our neighbors and business owners. Please stay connected by reading the News and Tribune and by visiting our website.”

Ah, but lest we forget, Team Gahan didn't want this meeting to occur in the first place. John Rosenbarger, Larry Summers, et al -- they publicly sulked and pouted when INDOT reminded them of their legal obligations v.v. the intersection's change in configuration, and as Gahan babbled incoherently ("that's why we're here") ...


 ... the functionaries smirked.



The Jeffersonville chain newspaper's Morris properly waited a bit to acquire quotes from the Taborite objectors, who did their homework.

It was worth it.

Plan for Mt. Tabor Road-Klerner Lane intersection on hold

NEW ALBANY — Bidding for phase one of the Mount Tabor Road project begins Feb. 7 and work is slated to start in April or May. But there will be one major change moving forward. Phase one won't include the intersection of Mount Tabor Road and Klerner Lane ...

... One of those residents, Scott Whalen, said he was happy to hear the city is taking a second look at its plans for the intersection.

"It is great news that the city has chosen to take another look at the traffic conditions at the intersection while they address the primary reason for the project — the hillside leading to Slate Run Creek," Whalen said via email. "As not only a stakeholder in the project, but also as an engineer, it is important to ensure the measured conditions represent the typical use. Performing the traffic counts for only 24 hours and while the intersection was the detour for McDonald Lane did not meet this criteria. The re-evaluation is what we at the corner have been asking for" ...

... INDOT told the city that it should complete an additional information document and involve the public with its plans again to become NEPA complaint, which is a requirement for federally funded projects.

"Although I’m relieved to learn somebody finally heard the residents, it’s disheartening to know that all parties involved have already spent thousands of dollars on legal fees. Why did we (the local residents) have to reach out to the top state politicians and INDOT management for our own city to listen to us," resident Kelly Feiock said in an email. "We’re not shy and we’re willing to talk. All of this wasted time and money could have been avoided five years ago with open communication."

So, really -- why the change of heart? Politics -- first, last and always.

It isn't so much about disappearing votes in the 6th district, Gahan's traditional home field. The 6th already is lost to Democrats, probably for a generation. Rather, it's about panicked quarantine.

No one's buying City Hall's limp palaver about the housing authority putsch, and with each passing day, more Democrats are looking at the dynamism of Dan Canon and Liz Watson, contrasting them with Gahan's agoraphobic, bunker-confined DINO disguise, and scratching their heads in bewilderment.

Dan's and Liz's direction is incompatible with Jeffrey's, and it's likely that DemoDisneyDixiecratic party chairman Adam Dickey has been cooing seductively in Gahan's ear, but the irony remains, because apart from his own self-generated mythology, the mayor is far more of a liability to the party than an asset.

And that's fine by the resistance. Don't forget: #FireGahan2019

Tuesday, May 30, 2017

ASK THE BORED: Anti-climactic paving bids, Elm Street speedway work and the forthcoming W. 1st and Main intersection.


The minutes from May 23 are in, and the low bid for this season's citywide paving extravaganza ... like always ...


MAC! MAC! MAC!

No word on the inevitable re-dos, do-overs, or other famous stuffed-envelope-driven hallmarks of beak wetting borne of annual paving -- but guys, low bid!

Meanwhile, two other items about grid modernization (i.e., paving) and the W. 1st and Main work.

Elm Street paving begins now. There'll be a second street where average traffic speeds increase by 15% prior to the two-way restriping.


Finally, the quarter-million dollar W. 1st Street and Main Street Crosswalk project, photos of which follow, draws nearer to completion.

For a reprise of the long exhausting march toward a human-friendly intersection, with Team Gahan resisting every step, consult this popular previous post.

ASK THE BORED: It's a pretty penny, but safety for humans at the intersection of Main and W. 1st draws nearer.

This is welcome news, and takes on added importance given the resistance with which City Hall initially greeted the idea. I'll never forget being informed in detail as to the absolute impossibility of such a human-friendly notion -- although negotiating with INDOT to ensure 2015 election-year street paving on Main rather than substantive dialogue about safety proved to be a very do-able priority.

They do excel at certain things.